Metallic carpentry | Suspended lattice
Assembly at height
Suspended reticular metal carpentry – mounting at height
In the video, the salient phases of the high-altitude shooting and assembly of the truss structure of the residential complex under construction by the Chianese Group S.r.l. of Salerno, based on a project by Eng. Antonio Marano and Eng. Antonio La Montagna.
Job description:
The suspended structure is anchored, in correspondence with the end frames, to a braced frame which, starting from the base of the building, has been suitably fixed to the supporting frame in reinforced concrete. of the stairs.
The procedure for pulling up and assembling the steel structures has been studied in every detail, previously assembled on the ground in three parts and assembled respectively starting from the base reticular plate, followed by the assembly of the intermediate frame and therefore, of the second level frame and roof.
Icomet Costruzioni Metalliche Srl – Metallic Carpentry – Builders of Ideas