Metallic carpentry | Bagging machine assembly
Cement plant
Suspended reticular metal carpentry – mounting at height
Video assembly of a metal carpentry structure for the bagging shed in the Constantinople cement plant in Barile (PZ), based on a project by Eng. Raffaele Giansanti.
Job description:
The intervention involved the production and assembly of a new building intended for the bagging and packaging of cement for the Constantinople cement plant.
The project plant consists of a prefabricated metal structure with a rectangular plan, with plan dimensions of approximately 58.50 x 13.80 meters and a height at the top of 8.30 meters, topped at the end by a tower, for silos and various machinery, with plan dimensions of approximately 14.00 x 8.50 m and maximum height above ground of approximately 23 meters.
Click here to read the entire article
Icomet Costruzioni Metalliche Srl – Metallic Carpentry – Builders of Ideas